ir. Roman Petrov

Independent engineering expert · Belgium · worldwide

A second opinion that starts from the physics.

Before anything is calculated, specified or bought, I check whether the problem is understood correctly. Industrial climate and process air, building services, energy systems — and advanced nuclear.

Find your questionWrite to me

Plate I. Warm air does not go where the drawing says it goes.

How I work

  1. 1

    Measure before believing

    The most expensive mistakes begin with a plausible but wrong explanation. I go on site, measure, and test the explanation before anyone designs a cure.

  2. 2

    Widen the option space

    A concept presented as the only one rarely is. I look at what was excluded, why, and whether the engineering basis was shaped by what someone wanted to sell.

  3. 3

    Prove it with numbers

    Psychrometrics, heat and mass balances, failure scenarios, CFD where it matters. Recommendations come with numbers, not adjectives.

Plate II. A hot hall cooled by evaporation: the process heat itself keeps the humidity down.

Find your question

Choose your industry and see what I can bring — or start from what you need and see where I have done it. Where I have a case, it is linked.

Food & beverage

Bakeries, mills, meat, dairy, coffee, drinks — where air, temperature and humidity are part of the product.

  1. Diagnosis & troubleshooting

    The product fails only in some seasons and nobody can say why. Is it the process, the air or the building?

  2. Basis of design

    A new line is coming. What must air, temperature and humidity do for the product — in numbers a contractor can be held to?

  3. Feasibility & options

    Mechanical cooling, evaporative cooling or simply better air distribution — which one really pays back in our hall?

  4. Owner's engineer

    The contractor offers cheaper units 'with the same capacity'. Are they equivalent at our operating point?

  5. Technical due diligence

    We are acquiring a plant. What will its HVAC, process air and utilities cost us over the next five years?

  6. Forensic & claims

    A batch spoiled in storage or in the package. Was it the cooling, the operation or the design?

Industrial manufacturing

Plastics, packaging, paper, polymers — processes that react to static, draughts, moisture and heat.

  1. Diagnosis & troubleshooting

    Quality drifts with the weather — static, warping, moisture. Where does the variation really come from?

  2. Basis of design

    Which volume truly needs conditioning: the whole hall, or only the process zone?

  3. Feasibility & options

    Can operators work comfortably next to hot equipment without the airflow disturbing the process?

  4. Owner's engineer

    Before handover: does the installed system deliver the performance we paid for, including when something fails?

  5. Technical due diligence

    How much of this site's energy bill is the building fighting the process?

  6. Forensic & claims

    A line stopped and product was lost. Was the utility system the cause, and whose responsibility is it?

Warehousing, cold chain & logistics

Large volumes, racks, docks, cold rooms — where uniformity and condensation decide the quality of stored goods.

  1. Diagnosis & troubleshooting

    Condensation drips onto goods, temperatures differ along the racks. Why, and what is the smallest fix?

  2. Basis of design

    Can one large volume work as a warehouse and as a process environment at the same time?

  3. Feasibility & options

    Extension or new building: what thermal and energy envelope will the stored goods really need?

  4. Owner's engineer

    At acceptance: do refrigeration and air distribution hold the setpoint in every corner, not only at the sensor?

  5. Technical due diligence

    A logistics asset with refrigeration: condition, remaining life, refrigerant compliance and capex exposure?

  6. Forensic & claims

    Cooling failed and stock was lost. What happened first, and was it foreseeable?

Buildings

Offices, housing, developers, architects — from concept choice to construction and handover.

  1. Diagnosis & troubleshooting

    Draughts, overheating or stale air in a new building. Design, installation or operation?

  2. Basis of design

    The design team put one concept on the table. Were the alternatives examined at all?

  3. Feasibility & options

    Geothermal, heat pumps, open or closed loop — what does this particular site actually allow?

  4. Owner's engineer

    An engineer on the owner's side during design and construction, checking substitutions, levels and interfaces before they become irreversible.

  5. Technical due diligence

    Buying or refinancing a building: are the building services what the documents say, and in what condition?

  6. Forensic & claims

    A dispute over HVAC or drainage performance. What does the physics say, and what would a neutral expert conclude?

Technical rooms

Battery rooms, electrical rooms, plant rooms — small spaces where safety and redundancy are not negotiable.

  1. Diagnosis & troubleshooting

    The room overheats or alarms trip, although the cooling is 'sized correctly'.

  2. Basis of design

    Battery-room ventilation: is the safety concept consistent — dilution or stratification — and where must extraction really be?

  3. Feasibility & options

    Ventilation, cooling or relocation: what is the simplest way to make the room safe and compliant?

  4. Owner's engineer

    Two fans are installed. Is it really N+1 when one of them stops?

  5. Technical due diligence

    Are the critical rooms of this asset a hidden liability — hydrogen, heat, false redundancy?

  6. Forensic & claims

    Equipment in a technical room failed from heat or humidity. Why, and who carries it?

Data centres

Cooling, redundancy and heat reuse, judged by failure scenarios rather than by equipment count.

  1. Diagnosis & troubleshooting

    Hot spots and recirculation although the installed cooling capacity is more than enough.

  2. Basis of design

    Which redundancy, temperatures and failure scenarios must the basis of design state explicitly?

  3. Feasibility & options

    Free cooling, evaporative, liquid cooling, heat reuse — what works in this climate and at this density?

  4. Owner's engineer

    Owner-side review of design and contractor proposals, with redundancy checked by failure scenario, not by equipment count.

  5. Technical due diligence

    Technical due diligence: cooling resilience, single points of failure, headroom for upgrades.

  6. Forensic & claims

    An outage linked to cooling: reconstruct the sequence and find the root cause.

Industrial heat & decarbonisation

Heat pumps, waste-heat recovery, boiler and chiller plants — when the savings must be physically real.

  1. Diagnosis & troubleshooting

    The heat-pump or boiler plant cycles, underperforms, never reaches the promised efficiency.

  2. Basis of design

    Electrifying process heat: which temperatures, loads and profiles must the new system really serve?

  3. Feasibility & options

    Three identical units or 2/3 + 1/3? Heat pump, waste-heat recovery or both? Options compared on one basis.

  4. Owner's engineer

    A supplier-led concept is on the table. Is the engineering basis independent of the equipment being sold?

  5. Technical due diligence

    A site decarbonisation roadmap: are the promised savings physically plausible?

  6. Forensic & claims

    A heat-recovery project did not deliver the savings that were promised. Why?

Nuclear, SMR & fusion

Ventilation, cooling and thermal-fluid systems of nuclear and fusion facilities, and advanced-reactor concepts.

  1. Diagnosis & troubleshooting

    A ventilation or cooling system of a nuclear or fusion facility behaves differently from its design intent.

  2. Basis of design

    SMR or advanced reactor: the HVAC and cooling basis of design for confinement, heat removal and operation.

  3. Feasibility & options

    An early concept: does it fit the space, the physics and the safety logic before detailed design starts?

  4. Owner's engineer

    Independent review of the design organisation's deliverables, on the owner's or investor's side.

  5. Technical due diligence

    The investor's question: is this reactor or fusion concept physically credible, and where are its hard limits?

  6. Forensic & claims

    An event or non-conformance needs an independent root-cause view of the thermal-fluid systems.

Research infrastructure

Laboratories, experimental halls, accelerators — where the experiment sets the tolerance, not the comfort standard.

  1. Diagnosis & troubleshooting

    A laboratory or experimental hall drifts out of tolerance in temperature, humidity or cleanliness.

  2. Basis of design

    Translating what the experiment needs into an HVAC and cooling basis of design.

  3. Feasibility & options

    A space-constrained installation: can a different operating state move the limit, instead of more geometry?

  4. Owner's engineer

    Owner's engineer for a laboratory or test-facility build: specification, substitutions, acceptance.

  5. Technical due diligence

    Condition and capability of an existing research infrastructure before an upgrade or transfer.

  6. Forensic & claims

    An experiment was lost because the environment drifted. What failed?

Diagnosis & troubleshooting

On site, with instruments. I first test whether the problem is described correctly, then find the physics that actually drives it.

  1. Food & beverage

    The product fails only in some seasons and nobody can say why. Is it the process, the air or the building?

  2. Industrial manufacturing

    Quality drifts with the weather — static, warping, moisture. Where does the variation really come from?

  3. Warehousing, cold chain & logistics

    Condensation drips onto goods, temperatures differ along the racks. Why, and what is the smallest fix?

  4. Buildings

    Draughts, overheating or stale air in a new building. Design, installation or operation?

  5. Technical rooms

    The room overheats or alarms trip, although the cooling is 'sized correctly'.

  6. Data centres

    Hot spots and recirculation although the installed cooling capacity is more than enough.

  7. Industrial heat & decarbonisation

    The heat-pump or boiler plant cycles, underperforms, never reaches the promised efficiency.

  8. Nuclear, SMR & fusion

    A ventilation or cooling system of a nuclear or fusion facility behaves differently from its design intent.

  9. Research infrastructure

    A laboratory or experimental hall drifts out of tolerance in temperature, humidity or cleanliness.

Basis of design

Writing or reviewing the basis of design: product and process requirements turned into criteria a designer can calculate and a contractor can be held to.

  1. Food & beverage

    A new line is coming. What must air, temperature and humidity do for the product — in numbers a contractor can be held to?

  2. Industrial manufacturing

    Which volume truly needs conditioning: the whole hall, or only the process zone?

  3. Warehousing, cold chain & logistics

    Can one large volume work as a warehouse and as a process environment at the same time?

  4. Buildings

    The design team put one concept on the table. Were the alternatives examined at all?

  5. Technical rooms

    Battery-room ventilation: is the safety concept consistent — dilution or stratification — and where must extraction really be?

  6. Data centres

    Which redundancy, temperatures and failure scenarios must the basis of design state explicitly?

  7. Industrial heat & decarbonisation

    Electrifying process heat: which temperatures, loads and profiles must the new system really serve?

  8. Nuclear, SMR & fusion

    SMR or advanced reactor: the HVAC and cooling basis of design for confinement, heat removal and operation.

  9. Research infrastructure

    Translating what the experiment needs into an HVAC and cooling basis of design.

Feasibility & options

Pre-feasibility and feasibility: the full space of options, compared on one basis, before money is committed.

  1. Food & beverage

    Mechanical cooling, evaporative cooling or simply better air distribution — which one really pays back in our hall?

  2. Industrial manufacturing

    Can operators work comfortably next to hot equipment without the airflow disturbing the process?

  3. Warehousing, cold chain & logistics

    Extension or new building: what thermal and energy envelope will the stored goods really need?

  4. Buildings

    Geothermal, heat pumps, open or closed loop — what does this particular site actually allow?

  5. Technical rooms

    Ventilation, cooling or relocation: what is the simplest way to make the room safe and compliant?

  6. Data centres

    Free cooling, evaporative, liquid cooling, heat reuse — what works in this climate and at this density?

  7. Industrial heat & decarbonisation

    Three identical units or 2/3 + 1/3? Heat pump, waste-heat recovery or both? Options compared on one basis.

  8. Nuclear, SMR & fusion

    An early concept: does it fit the space, the physics and the safety logic before detailed design starts?

  9. Research infrastructure

    A space-constrained installation: can a different operating state move the limit, instead of more geometry?

Owner's engineer

On the client's side through design, procurement and construction: substitutions, interfaces, levels, acceptance.

  1. Food & beverage

    The contractor offers cheaper units 'with the same capacity'. Are they equivalent at our operating point?

  2. Industrial manufacturing

    Before handover: does the installed system deliver the performance we paid for, including when something fails?

  3. Warehousing, cold chain & logistics

    At acceptance: do refrigeration and air distribution hold the setpoint in every corner, not only at the sensor?

  4. Buildings

    An engineer on the owner's side during design and construction, checking substitutions, levels and interfaces before they become irreversible.

  5. Technical rooms

    Two fans are installed. Is it really N+1 when one of them stops?

  6. Data centres

    Owner-side review of design and contractor proposals, with redundancy checked by failure scenario, not by equipment count.

  7. Industrial heat & decarbonisation

    A supplier-led concept is on the table. Is the engineering basis independent of the equipment being sold?

  8. Nuclear, SMR & fusion

    Independent review of the design organisation's deliverables, on the owner's or investor's side.

  9. Research infrastructure

    Owner's engineer for a laboratory or test-facility build: specification, substitutions, acceptance.

Technical due diligence

For buyers, lenders and investors: what the systems really are, what condition they are in, and what they will cost.

  1. Food & beverage

    We are acquiring a plant. What will its HVAC, process air and utilities cost us over the next five years?

  2. Industrial manufacturing

    How much of this site's energy bill is the building fighting the process?

  3. Warehousing, cold chain & logistics

    A logistics asset with refrigeration: condition, remaining life, refrigerant compliance and capex exposure?

  4. Buildings

    Buying or refinancing a building: are the building services what the documents say, and in what condition?

  5. Technical rooms

    Are the critical rooms of this asset a hidden liability — hydrogen, heat, false redundancy?

  6. Data centres

    Technical due diligence: cooling resilience, single points of failure, headroom for upgrades.

  7. Industrial heat & decarbonisation

    A site decarbonisation roadmap: are the promised savings physically plausible?

  8. Nuclear, SMR & fusion

    The investor's question: is this reactor or fusion concept physically credible, and where are its hard limits?

  9. Research infrastructure

    Condition and capability of an existing research infrastructure before an upgrade or transfer.

Forensic & claims

After a loss or in a dispute: an independent reconstruction of what happened and why — for insurers, loss adjusters, lawyers and courts.

  1. Food & beverage

    A batch spoiled in storage or in the package. Was it the cooling, the operation or the design?

  2. Industrial manufacturing

    A line stopped and product was lost. Was the utility system the cause, and whose responsibility is it?

  3. Warehousing, cold chain & logistics

    Cooling failed and stock was lost. What happened first, and was it foreseeable?

  4. Buildings

    A dispute over HVAC or drainage performance. What does the physics say, and what would a neutral expert conclude?

  5. Technical rooms

    Equipment in a technical room failed from heat or humidity. Why, and who carries it?

  6. Data centres

    An outage linked to cooling: reconstruct the sequence and find the root cause.

  7. Industrial heat & decarbonisation

    A heat-recovery project did not deliver the savings that were promised. Why?

  8. Nuclear, SMR & fusion

    An event or non-conformance needs an independent root-cause view of the thermal-fluid systems.

  9. Research infrastructure

    An experiment was lost because the environment drifted. What failed?

Cases

Real assignments, anonymised. Each one began with an explanation that everybody believed — and that turned out to be incomplete or wrong.

Food & beverage
Diagnosis & troubleshooting · Feasibility & options
Mineral-water bottling hall: the CO₂ nobody measuredOld air-handling units had to be replaced by units with heat recovery. The new units did not fit the roof space left between solar panels, and nobody wanted the job.

What it turned out to be

Warm supply air never reached the floor and was sucked straight back. CO₂ escaped from cold mineral water in the drains and spread along the floor: people breathed 2,000–4,000 ppm while the units' sensors saw 1,500. In winter the warehouse below exceeded 5,000 ppm.

Result

Air-handling capacity halved, fitting the roof. Lower energy use, near-free evaporative cooling in summer, control on CO₂ at breathing level, less noise, no unhygienic ductwork. Verified by CFD, with performance guarantees.

A large hall with eight production lines, a high roof and a glazed north wall. Each line had its own air-handling unit, with supply and extract grilles in ducts running along the lines and pointing down.

The new strategy turned the hall into an upturned bath: extraction through openings under the roof without ducts, supply through movable fabric ducts low in the hall, heating mainly from the process equipment and destratification fans, CO₂ captured at its source and mixed where capture was impossible. Process waste heat covers the remaining heating, needed less than 5% of the year.

The glazed north wall is now swept by air without heating; the same jets mix the hall and remove condensation.

The lessonVentilation was sized for a contaminant that nobody had measured where people breathe.

Food & beverage
Diagnosis & troubleshooting
Sliced salami that stuck togetherPizza-topping salami stuck together after slicing; customers rejected the product.

What it turned out to be

Around 0 °C and 100% relative humidity in the cutting room, with no recirculation: all supply air is fresh air for sanitary overpressure. The obvious cure — deep cooling and reheating — meant high reheat costs and iced coils.

Result

A recuperative exchanger reheats the over-cooled air with incoming fresh air and pre-cools the fresh air at the same time: no reheat coil. Twin coils alternate between cooling and defrosting. Verified by CFD, with guarantees. The salami stopped sticking.

The lessonThe expensive part of the obvious solution can often be paid by the process itself.

Food & beverage
Diagnosis & troubleshooting
A flour mill losing 4% of its product valueThe flour came out too dry. Moisture content is regulated, and every point below the limit is money lost — here about 4% of the value of all the flour.

What it turned out to be

The mill is a heat source: stones and pneumatic conveying heat the air, and the hot air carries moisture out of the product. The building was under strong constant underpressure, pulling in uncontrolled air.

Result

Evaporative cooling of the air in the rooms that feed the pneumatic conveying, and separation of those rooms from the rest of the building. The air arrives pre-cooled and humidified; outlet relative humidity never exceeded 50–60% because process heating lowers it. The flour reached the required moisture.

The lessonRelative and absolute humidity are different quantities. Using the difference is cheaper than fighting it.

Food & beverage
Diagnosis & troubleshooting
Coffee roastery: carbon monoxide that 'collects at the floor'Unacceptable carbon monoxide levels in winter. Nobody wanted draughts; there is no heating — ovens and bags of warm coffee are enough. The client's own ventilation attempts had failed.

What it turned out to be

Measurements rejected the belief that CO collects low. It is released by warm coffee in the bags and rises — and the destratification fans installed 'so CO does not accumulate below' were mixing it back down to breathing level.

Result

Destratification fans removed, one extract fan installed, make-up air taken from the already heated packing hall, and the coffee bags screened off so the gas rises straight under the roof. CO at breathing level dropped almost to zero.

The lessonThe cure was installed for a problem described the wrong way round.

Food & beverage · Industrial heat & decarbonisation
Feasibility & options
A hot crisps hall cooled without mechanical refrigerationStaff suffered from heat next to the ovens. Two suppliers had already proposed mechanical cooling.

What it turned out to be

Evaporative cooling was rejected out of fear of humidity in the product. The psychrometrics and the heat balance showed the opposite: the large internal heat gain keeps raising the air temperature and so lowering its relative humidity — no higher than about 50% in the working zone.

Result

Evaporative cooling of the supply air, confirmed by CFD for the distribution of temperature and humidity, not only for the averages. A simpler and cheaper system than the two offers on the table.

The lessonWhat looked like the constraint — enormous internal heat — was what made the cheaper solution work.

Food & beverage
Diagnosis & troubleshooting · Forensic & claims
Flatbread that went damp inside a closed packageFlatbread was packed hot and dry, yet periodically went damp inside the sealed package.

What it turned out to be

Not the oven and not the film, but the seasonal ventilation mode. In damp or foggy weather outdoor air entered the production hall; heated, its moisture became invisible, and on cooling inside the package the product passed the dew point.

Result

A changed ventilation scheme and airflow direction removed the source of moisture, and with it the defect.

The lessonA defect of the finished product can be the signature of weather, ventilation and cooling acting together.

Warehousing, cold chain & logistics · Food & beverage
Basis of design
A beer-maturation warehouse held within ±0.5 °CBeer matured in the bottle at about 28 °C. The client wanted to merge the maturation room with a very large, very high warehouse — logical for logistics, hard for uniform temperature.

What it turned out to be

The requirement was not comfort but process: every bottle of a batch must mature at the same rate. That made it an engineering criterion — about ±0.5 °C throughout the volume.

Result

Long-throw air jets arranged to overlap and drive circulation through the whole volume, with temperature uniformity verified before the scheme was fixed. One volume works as warehouse and as process environment.

The lessonTurn a product-quality requirement into a measurable design criterion, then prove it.

Industrial manufacturing · Warehousing, cold chain & logistics
Basis of design · Forensic & claims
Corrugated board: a buffer store that would have rained on the productFor a new board factory the owner was offered to use the cooling zone after the corrugator as a high buffer store as well — fewer movements, continuous feed to the cutting lines.

What it turned out to be

I measured the residual moisture of freshly glued three- and five-layer board. As it cools, it releases a large amount of water into the air; in a high store with massive concrete walls this would condense on colder surfaces and drip back onto the board.

Result

The logistically elegant layout was shown to be physically unworkable without changing the heat and moisture regime of the space — before it was built.

The lessonBefore merging a process step with storage, check the transient behaviour of the product, not only material flow and floor area.

Industrial manufacturing
Basis of design · Diagnosis & troubleshooting
Flocking line: humidify the booth, not the buildingFlocking of automotive plastic parts needs controlled humidity: dry air builds static and spoils the fibre coating. The owner humidified the whole hall with sprinklers — lots of treated water, scaling, maintenance, and still seasonal trouble.

What it turned out to be

The requirement was local; the solution was global. The control volume was simply chosen wrong.

Result

Humidity held only inside the flocking booths, by evaporative humidification. Less water and treatment, a drier and more comfortable hall for staff, and a process parameter independent of the season.

The lessonChoosing the right control volume can cut capex and opex and stabilise the process at once.

Industrial manufacturing
Diagnosis & troubleshooting · Feasibility & options
PTFE tube extrusion: cooling people without disturbing the meltVertical extruders and ovens; maintenance at the top, under the roof, in extreme heat. Opening roof vents created draughts that disturbed the hanging, still-forming tube.

What it turned out to be

The obvious fix protected the people and endangered the product. The flow structure had to change, not just the airflow rate.

Result

Evaporatively cooled air supplied from the sides at controlled velocity intercepts and dilutes the rising heat before it reaches the service zone. CFD confirmed both the temperature field and acceptable air velocities at the extrusion.

The lessonWhen ventilation conflicts with the process, redesign the flow pattern rather than the volume of air.

Buildings · Industrial heat & decarbonisation
Feasibility & options · Owner's engineer · Basis of design
A sustainable-heating concept with only one optionI was asked to assess the heating concept for a building. The documents offered essentially one solution: a closed-loop geothermal field.

What it turned out to be

From about 2,000 km away, using available data: groundwater at about 32 m made an open-loop scheme a candidate, but the site investigation stopped at about 10 m. The documents contained fossils of previous projects, and the designers' incentives were tied to the equipment supplier.

Result

An early, independent concept challenge: not only the calculations of the chosen solution, but why it was chosen, which site-specific alternatives were excluded, and whether the engineering basis had been replaced by a supplier's commercial logic.

The lessonReview why a concept was chosen, not only whether it was calculated correctly.

Buildings
Owner's engineer
Residential block: a 'value-engineering' swap that would not have workedDuring construction the contractor proposed cheaper heat-recovery ventilation units with the same nominal airflow. Separately, many sockets were placed on concrete walls.

What it turned out to be

The replacement units had a different available external static pressure: equivalent on the airflow line of the datasheet, not at the operating point of the duct network. The sockets meant repeated chasing and drilling across the whole building, avoidable by moving them to other walls.

Result

The substitution was stopped before installation, avoiding units that would have missed the design airflow and a later replacement; the socket layout was changed.

The lessonCheck substitutions at the system's operating point, and details by their repeated cost across the building.

Technical rooms · Buildings
Owner's engineer · Technical due diligence
Two fans, no redundancyAn installed ventilation group with two fans, designed as N+1. In normal operation it worked well.

What it turned out to be

The fans were not separated by non-return dampers. If one stopped, the running fan short-circuited air through the stopped one and useful flow collapsed: two machines physically, no functional redundancy.

Result

The arrangement was rebuilt with proper separation of the branches.

The lessonRedundancy is verified by the failure scenario and the real flow paths, not by counting equipment.

Technical rooms
Basis of design · Owner's engineer
Battery room: a hydrogen concept that contradicted itselfA large battery room had destratification fans to mix the air and, at the same time, ceiling-level extract ducts to remove a hydrogen layer under the roof.

What it turned out to be

If the mixing works, there is no stable hydrogen layer to extract. If the design assumes a layer, extraction must be taken from it — yet the grilles were on the underside of the ducts, leaving a stagnant layer exactly where the hydrogen would collect.

Result

The inconsistency was identified at review, and the concept was clarified around one physical assumption, with extraction located where that assumption requires it.

The lessonA safety concept must be logically consistent in its physics: you cannot rely on full mixing and on stratification of the same gas.

Buildings
Owner's engineer
Office building: a sewer connection above the tankWastewater went to a septic tank at level −2 and was pumped to the municipal sewer.

What it turned out to be

On site, during construction, I checked the real levels of the external network: the municipal pipe was higher than the tank and higher than the design outlet. The connection as designed could not work.

Result

The tank was moved from −2 to −1, with piping, pump logic and structural details adapted — late, but before it became irreversible.

The lessonCheck critical external interfaces against real absolute levels before the internal scheme is frozen.

Industrial heat & decarbonisation · Buildings
Feasibility & options · Basis of design
Pattern: 2/3 + 1/3 instead of three identical machinesBoiler, chiller or heat-pump cascades are often specified as three identical units.

What it turned out to be

Two machines of about 2/3 and 1/3 of the design load keep two independent units and give natural steps of 1/3, 2/3 and 100% — without a third machine.

Result

Less equipment, useful redundancy and good part-load staging. Checked each time against minimum modulation, part-load efficiency, redundancy and availability requirements.

The lessonDo not accept a symmetrical cascade as given; size the units so the architecture itself delivers the dynamics.

Nuclear, SMR & fusion · Research infrastructure
Feasibility & options
Idea: water capacitors near 0 °C for a pulsed-power installationA pulsed-power energy store with water-dielectric capacitors did not fit the available floor plan in its standard configuration.

What it turned out to be

Instead of compressing the geometry further, change the operating state of the dielectric: the relative permittivity of pure water rises as it is cooled, increasing capacitance at the same geometry.

Result

A path to more stored energy in the same volume, subject to checks of field strength and breakdown at real water purity, electrode geometry and pulse length.

The lessonWhen geometric optimisation hits a physical limit, check whether the material's operating state can move the limit.

Advanced nuclear

I am a nuclear power engineer by training. Next to the industrial work I develop concepts for advanced reactors, and I bring the same habit to them: start from the physics, then the engineering.

Where I can help

  • HVAC, cooling and confinement ventilation for SMRs and advanced reactors
  • Heat-removal and thermal-fluid concepts, early feasibility and space fit
  • Independent concept review for owners and investors
  • Molten-fuel fast-spectrum and accelerator-driven systems
  • Pulsed-power and fusion support systems

Publications and patent

  1. The O-Ring Fuel Channel: A Self-Circulating Toroidal Concept for Molten-Fuel Fast-Spectrum ReactorsZenodo, DOI 10.5281/zenodo.19133606
  2. Dynamic Window for Accelerator-Driven Subcritical Systems: Moving Vacuum Barrier Enabling Homogeneous High-Temperature FuelZenodo, DOI 10.5281/zenodo.19401754
  3. Innovative liquid fuel systems for fast neutron reactors (in-situ breeding)European patent application EP 4 756 839, European Patent Bulletin 2026/24

Independent work. No information of any employer or client is used or disclosed.

Plate III. A toroidal fuel channel: the flow closes on itself.

Background

Nuclear power engineer, Kyiv Polytechnic Institute (1995), with a recognised equivalent in Belgium. Diploma work: Monte Carlo modelling of neutron flux in a PWR vessel.

Three decades across the field: reactor-physics research and quality systems for nuclear plants; chief engineer for aircraft engines at an airline; HVAC installation and service; energy and investment consulting; project engineering for an HVAC contractor; MEP coordination of a building with a ~€30 M MEP budget; lead engineer for custom industrial climate solutions — on-site surveys, thermodynamics, CFD; today engineering of nuclear facilities.

The thread through all of it: the expensive mistakes are made at the beginning, when the problem is first described.

Based in
Ghent area, Belgium
Works
Worldwide, on site and remotely — except sanctioned or restricted-access territories
Tools
On-site measurement, psychrometrics, heat and mass balances, CFD, Python
Independence
No equipment sales, no supplier commissions
Confidentiality
All cases anonymised; NDA on request

Working together

Write to me

Describe the problem in a few lines — what you see, what you were told, what is at stake. I reply personally.

Or directlyir@petrov.re
LinkedIn

Worldwide, on site and remotely — except sanctioned or restricted-access territories